Projects

Project Cases

Canteen kitchens, food-processing plants, fresh-retail stores, produce origins and pharmacy clinics each call for a different cold room approach. The cases below are grouped by scenario.

0years in operation (founded 2013)
0cold room types undertaken
0% panels & doors made in-house
0hr local response time

Project Types

Browse by scenario

Cases are grouped by application. If you would like configuration ideas closer to your own situation, call us directly or submit an online enquiry.

Corporate staff canteen cold rooms

Chill and freezer placed as separate compartments beside the receiving bay, installed alongside stainless worktables and cabinets.

  • 2 roomsChill + freezer
  • -18 °CFreezer temp
  • TogetherKitchen equipment

Campus canteen cold rooms

Capacity calculated from headcount and delivery frequency, with internal zoning to keep raw and ready-to-eat goods apart.

  • ZonedRaw / ready-to-eat
  • SizedTo demand
  • ExpandableRooms added later

Packaged canteen kitchen + cold room projects

Cold room delivered with ranges, steamers, worktables and ventilation in one contract, cutting multi-contractor site coordination.

  • PackageCold room + kitchen
  • LessCross-party coordination

Public Information

Public tender participation records

The entries below are compiled from public sources to illustrate the types of projects the company has taken part in. They do not indicate final award results — verify against official announcements before publishing.

Table 2  Project participation records traceable via public channels (sample compilation — verify before publishing)
Project Type Scope
Cold room procurement for the staff canteen, Jinan Passenger Depot, China Railway Jinan Group Group canteen Cold room supply & installation
Canteen cold rooms, Shandong University Qingdao Campus University logistics Canteen cold room works
Kitchen equipment procurement, Fengcheng Runxin Xiaoyuan canteen, Yinchuan Institutional canteen Kitchen equipment supply

Note: once client authorisation is obtained and award results confirmed, this table can be replaced with a fuller case presentation (site photos, capacity, temperatures and delivery periods).

Delivery Assurance

Everything that matters goes in the quote

Transparent itemisation

Panel thickness, facing, unit brand, door type and lead time itemised line by line — no vague phrases like "equivalent grade".

Committed schedule

Production and installation periods are agreed in the contract; if site conditions change we talk early, never at the last minute.

Warranty & service

Warranty after handover, and long-term repair, maintenance, expansion and retrofit support — with faster local response.

One call reaches the team

Plant in Boxing: sales, production and installation share one office, so issues don't bounce between suppliers.

Want to see how a similar project was approached?

Describe your scenario and scale — we'll share configuration ideas and budget references from comparable jobs, and can arrange a visit to a nearby site.

Get a Quote